The electricity from the Macedon BESS project will first flow to the Gisborne Zone Substation. From there it will flow to where the demand is. Typically this will be the local areas such as Macedon, Woodend and surrounding areas. Once the local load is supplied, excess electricity will be exported to the transmission network through the 66kV network to reach more distant areas such as Sunbury.